project at a glance
Client: Growland Group
Contract type: Supply & installation
Isolation Solution: Pool isolation & Outdoor Floating Floor isolation
Products used:
C8 Pool Mounts
XL Spring Mounts
On the cusp of the CBD, a new chapter begins at Victoria Square. Here, there are impeccably crafted residences from the acclaimed Fender Katsalidis, with architecture inspired by the rich history of the suburb and its significant river, it is a new landmark address with a real depth of character.
Embelton were tasked with supplying and installing C8 pool mounts on the Level 1 swimming pool and 60-off spring packs with a 21.6m x 5.1m pool. There was also a running track that required XL spring mounts on a concrete floating floor with approximately 200m running track distance.